Bestmind assisted SWS Engineering S.p.A. in the design management of a portfolio of 8 different railway projects for the same end customer, TCDD (Türkiye Cumhuriyeti Devlet Demiryolları – Turkish State Railways).
The portfolio included lines totalling about 800 km in length, of which about 500 km are high speed.

1 – Adapazarı – Istanbul High Speed
2 – Sivas – Erzincan High Speed

All projects included: cartography, corridor study, alignment definition, geological and geotechnical investigations, environmental impact assessment (EIA), hydraulic studies, road diversions, station design, tunnel design, viaduct design with different technologies, cost estimates, technical specifications and contractual documents.

1. High Speed Railway Line

Total Length109 km
Design speed250-300 km/h
Number of viaducts/bridges:25
Viaducts/bridges overall length10,509 m
Number of tunnels23
Tunnels overall length63.320 m
Number of stations2

2. High Speed Railway Line

Total Length245 km
Design speed250km/h
Number of viaducts/bridges:39
Viaducts/bridges overall length13,117 m
Number of tunnels37

3 – Nusaybin – Habur
4 – Mürşitpınar – Şanlıurfa

Bestmind initially performed due diligence on the projects, defining with company management the framework within which the projects would be completed. Activities were derived by defining the WBS (Work Breakdown Structure), time schedules and milestones, creating cost plans, and assessing the tools and human resources available to achieve the objectives on time and within budget.

3. Railway Line

Total Length135 km
Design speed160 km/h
Number of viaducts/bridges:18
Viaducts/bridges overall length6,850 m
Number of tunnels11
Tunnels overall length9,500 m
Number of stations2

4. Conventional Railway Line

Total Length65 km
Design speed160 km/h
Number of viaducts/bridges:5
Viaducts/bridges overall length1,385 m
Number of tunnels11
Tunnels overall length7,640 m
Number of stations3

5 – Gaziray (Gaziantep)
6 – Toprakkale – Bahçe

Bestmind then managed the tenders and interactions with subcontractors, as well as stakeholder engagement, creating a data storage system and a communication management plan. Project changes were continuously monitored, with scope, schedule and costs being updated accordingly.

5. Conventional Railway Line

Total Length25 km
Design speed160 km/h
Number of viaducts/bridges:2
Viaducts/bridges overall length80 m
Number of stations17

6. Conventional Railway Line

Total Length57 km
Design speed160 km/h
Number of viaducts/bridges:5
Viaducts/bridges overall length1,010 m
Number of tunnels5
Tunnels overall length9,785 m
Number of stations3

7 – Uşak (Eşme) – Salihli High Speed
8 – Arifiye Pamukova

7. High Speed Railway Line

Total Length78 km
Design speed250 km/h
Number of viaducts/bridges:20
Viaducts/bridges overall length3,902 m
Number of tunnels24
Tunnels overall length20,690 m

8. Conventional Railway Line

Total Length25 km